Published by:
Allied Business Academies
Length: 8 pages
Topics:
Rework cycle; Production yield
Share a link:
https://casecent.re/p/117317
Write a review
|
No reviews for this item
This product has not been used yet
Abstract
A production system with rework cycle and a process yield that follows a binomial distribution has been revisited. Based on a finite number of rework cycles and without assuming any probability distribution, a new formula for determining the number of units that must be started to achieve a required production yield has been proposed. This article makes a pedagogical contribution to the problem of production rework.
About
Abstract
A production system with rework cycle and a process yield that follows a binomial distribution has been revisited. Based on a finite number of rework cycles and without assuming any probability distribution, a new formula for determining the number of units that must be started to achieve a required production yield has been proposed. This article makes a pedagogical contribution to the problem of production rework.