Product details

By continuing to use our site you consent to the use of cookies as described in our privacy policy unless you have disabled them.
You can change your cookie settings at any time but parts of our site will not function correctly without them.
Case
-
Reference no. 9A98C020
Published by: Ivey Publishing
Originally published in: 1998
Version: 1999-01-20
Length: 18 pages
Data source: Field research

Abstract

The assembly supervisor at Navistar faces a critical supply problem; one that not only affects the bottom line but more importantly the customer. This case requires a student to determine what is and is not important, to think creatively about how to use the information provided, and to formulate a recommendation with respect to solving the current supply problem. The student must review: (1) a process flow chart in detail, (2) numerical data with respect to costs and frequency of specific causes for trim shortages, and (3) a number of identified causes for the supply problem. Navistar must look at value added activities, its internal policies and practices, storage of materials, a Just-In-Time inventory system that may be too tight, and communication difficulties that arise when last minute design changes occur.
Location:
Size:
Large

About

Abstract

The assembly supervisor at Navistar faces a critical supply problem; one that not only affects the bottom line but more importantly the customer. This case requires a student to determine what is and is not important, to think creatively about how to use the information provided, and to formulate a recommendation with respect to solving the current supply problem. The student must review: (1) a process flow chart in detail, (2) numerical data with respect to costs and frequency of specific causes for trim shortages, and (3) a number of identified causes for the supply problem. Navistar must look at value added activities, its internal policies and practices, storage of materials, a Just-In-Time inventory system that may be too tight, and communication difficulties that arise when last minute design changes occur.

Settings

Location:
Size:
Large

Related