Product details

By continuing to use our site you consent to the use of cookies as described in our privacy policy unless you have disabled them.
You can change your cookie settings at any time but parts of our site will not function correctly without them.
Case
-
Reference no. 9A97D012
Published by: Ivey Publishing
Originally published in: 1997
Version: 2000-02-07
Length: 17 pages
Data source: Field research

Abstract

The vice-president Operations of Spartan Plastics, is facing a trade-off. As an avid proponent of the Toyota production system, just in time manufacturing (JIT), ISO 9001, and continuous improvement, he has reduced setup times, batch sizes, and throughput times. On the other hand, the scrap rate has shot up. This case would be appropriate for use in a production and operations course, to introduce students to the concepts of JIT and world class manufacturing.
Location:
Size:
Small

About

Abstract

The vice-president Operations of Spartan Plastics, is facing a trade-off. As an avid proponent of the Toyota production system, just in time manufacturing (JIT), ISO 9001, and continuous improvement, he has reduced setup times, batch sizes, and throughput times. On the other hand, the scrap rate has shot up. This case would be appropriate for use in a production and operations course, to introduce students to the concepts of JIT and world class manufacturing.

Settings

Location:
Size:
Small

Related