Subject category:
Production and Operations Management
Published by:
Ivey Publishing
Version: 2000-02-07
Length: 17 pages
Data source: Field research
Share a link:
https://casecent.re/p/15575
Write a review
|
No reviews for this item
This product has not been used yet
Abstract
The vice-president Operations of Spartan Plastics, is facing a trade-off. As an avid proponent of the Toyota production system, just in time manufacturing (JIT), ISO 9001, and continuous improvement, he has reduced setup times, batch sizes, and throughput times. On the other hand, the scrap rate has shot up. This case would be appropriate for use in a production and operations course, to introduce students to the concepts of JIT and world class manufacturing.
About
Abstract
The vice-president Operations of Spartan Plastics, is facing a trade-off. As an avid proponent of the Toyota production system, just in time manufacturing (JIT), ISO 9001, and continuous improvement, he has reduced setup times, batch sizes, and throughput times. On the other hand, the scrap rate has shot up. This case would be appropriate for use in a production and operations course, to introduce students to the concepts of JIT and world class manufacturing.