Product details

By continuing to use our site you consent to the use of cookies as described in our privacy policy unless you have disabled them.
You can change your cookie settings at any time but parts of our site will not function correctly without them.

Abstract

One of the major reasons of layout-related difficulties faced by manufacturing industries is non-value-adding and redundant work. Plant layout study aims at economic production with larger volumes and variety as well. Method studies focus on the effectiveness with efficiency by a systematic critical scrutiny of work being done. The intention is to identify logical sequence of activities highlighting and eliminating the unnecessary mudas. Time and motion study is a combination of time study and motion study analysing and eliminating any unnecessary movement for productivity optimization of that job or process. Thus, through the elimination of unnecessary motions, times for performing the processes may be reduced and productivity increased. The intention is to subdivide the different operations of a job or process into measurable elements. Hence this case has been developed based on the primary data. The primary data was collected using Industrial Engineering Studies like layout study, method study and time and motion study. This case has been classroom tested with MBA students in their Lean Management Course. Arin Synthetics Ltd (ASL) though had installed modern machinery in its facility, process efficiency and optimization were a concern. Top Brass at ASL believed that ASL was overstaffed and its processes had creep as far as efficiency is concerned. This case focuses on ways to improve the process efficiency to rationalize the manpower at ASL. Presence in large growing global markets put cost pressure on ASL, thus mandating improvement in the efficiency of its processes through manpower rationalization. This case, therefore, discusses one of the highly staffed process of waste collection. Could ASL achieve reduction in the manpower in waste reduction without affecting the overall process? Was there a strategic mistake in the thought process of disposing of the waste generated by the manufacturing complex?

Geographical setting

Country:
India

About

Abstract

One of the major reasons of layout-related difficulties faced by manufacturing industries is non-value-adding and redundant work. Plant layout study aims at economic production with larger volumes and variety as well. Method studies focus on the effectiveness with efficiency by a systematic critical scrutiny of work being done. The intention is to identify logical sequence of activities highlighting and eliminating the unnecessary mudas. Time and motion study is a combination of time study and motion study analysing and eliminating any unnecessary movement for productivity optimization of that job or process. Thus, through the elimination of unnecessary motions, times for performing the processes may be reduced and productivity increased. The intention is to subdivide the different operations of a job or process into measurable elements. Hence this case has been developed based on the primary data. The primary data was collected using Industrial Engineering Studies like layout study, method study and time and motion study. This case has been classroom tested with MBA students in their Lean Management Course. Arin Synthetics Ltd (ASL) though had installed modern machinery in its facility, process efficiency and optimization were a concern. Top Brass at ASL believed that ASL was overstaffed and its processes had creep as far as efficiency is concerned. This case focuses on ways to improve the process efficiency to rationalize the manpower at ASL. Presence in large growing global markets put cost pressure on ASL, thus mandating improvement in the efficiency of its processes through manpower rationalization. This case, therefore, discusses one of the highly staffed process of waste collection. Could ASL achieve reduction in the manpower in waste reduction without affecting the overall process? Was there a strategic mistake in the thought process of disposing of the waste generated by the manufacturing complex?

Settings

Geographical setting

Country:
India

Related