Product details

By continuing to use our site you consent to the use of cookies as described in our privacy policy unless you have disabled them.
You can change your cookie settings at any time but parts of our site will not function correctly without them.

Abstract

The case describes the activities within the Plate Preparation Shop in a heavy engineering company. A full description is given of the information flows associated with the planning, scheduling and control of jobs in the shop. The main function of the case is to introduce students to a complicated scheduling and control situation and for them to devise improvements, especially those involving information technology. The case links to LVI (Denham Boilers Ltd) (688-008-1) and other cases in the series LVI (Denham Boilders Ltd) (B) to (E) follow (689-009-1 to 689-012-1).
Location:
Industry:
Size:
1,000 employees
Other setting(s):
1987-1989

About

Abstract

The case describes the activities within the Plate Preparation Shop in a heavy engineering company. A full description is given of the information flows associated with the planning, scheduling and control of jobs in the shop. The main function of the case is to introduce students to a complicated scheduling and control situation and for them to devise improvements, especially those involving information technology. The case links to LVI (Denham Boilers Ltd) (688-008-1) and other cases in the series LVI (Denham Boilders Ltd) (B) to (E) follow (689-009-1 to 689-012-1).

Settings

Location:
Industry:
Size:
1,000 employees
Other setting(s):
1987-1989

Related