Subject category:
Production and Operations Management
Published in:
1968
Share a link:
https://casecent.re/p/24714
Write a review
|
No reviews for this item
This product has not been used yet
Abstract
This is the fourth of a four-case series (668-020-1, 668-021-1, 668-022-1 and 668-023-1). The (D) case consists of extracts from an interview with the network coordinator in late 1966. He had been responsible for the introduction of the system and is now preparing a report on its defects.
About
Abstract
This is the fourth of a four-case series (668-020-1, 668-021-1, 668-022-1 and 668-023-1). The (D) case consists of extracts from an interview with the network coordinator in late 1966. He had been responsible for the introduction of the system and is now preparing a report on its defects.