Subject category:
Production and Operations Management
Published by:
Harvard Business Publishing
Version: 15 September 2010
Length: 21 pages
Data source: Field research
Abstract
Dore-Dore, a French manufacturer of socks and children's knitwear, has just converted a portion of its knitwear operations to a flexible modular system to allow faster response and greater flexibility. The case provides an opportunity to assess the changes in knitwear operations, and to evaluate whether a similar conversion to modular is appropriate for socks. Other opportunities for lead-time reduction can also be examined. Can be used to illustrate the impact of changing from a traditional linear batch operation to manufacturing cells and the impact of operating system design and lot size on through-put time, quality, productivity, etc. In addition, provides an opportunity to discuss channel lead time reduction.
About
Abstract
Dore-Dore, a French manufacturer of socks and children's knitwear, has just converted a portion of its knitwear operations to a flexible modular system to allow faster response and greater flexibility. The case provides an opportunity to assess the changes in knitwear operations, and to evaluate whether a similar conversion to modular is appropriate for socks. Other opportunities for lead-time reduction can also be examined. Can be used to illustrate the impact of changing from a traditional linear batch operation to manufacturing cells and the impact of operating system design and lot size on through-put time, quality, productivity, etc. In addition, provides an opportunity to discuss channel lead time reduction.
Settings
Location:
Industry:
Size:
FRF250 million revenue, 870 employees
Other setting(s):
1990