Product details

By continuing to use our site you consent to the use of cookies as described in our privacy policy unless you have disabled them.
You can change your cookie settings at any time but parts of our site will not function correctly without them.
Case
-
Reference no. 9-673-033
Published by: Harvard Business Publishing
Originally published in: 1984
Version: 29 February 1984
Length: 11 pages
Data source: Field research

Abstract

Illustration of the two main types of errors resulting from use of the economic order quantity (EOQ) as a tool in production scheduling. Designed to permit class discussion to begin with a consideration of one common type of mistake, errors in calculation of the EOQ volume resulting from use of incorrect data for the input parameters of the formula. The analysis can then shift to a more general discussion of the second type of error, the misapplication of EOQ and re-order point (ROP) techniques to a given system. Class discussion can conclude with student recommendations of alternative techniques which may be better suited to the Blanchard operation than the EOQ/ROP method.
Location:
Size:
USD4 million sales
Other setting(s):
1972

About

Abstract

Illustration of the two main types of errors resulting from use of the economic order quantity (EOQ) as a tool in production scheduling. Designed to permit class discussion to begin with a consideration of one common type of mistake, errors in calculation of the EOQ volume resulting from use of incorrect data for the input parameters of the formula. The analysis can then shift to a more general discussion of the second type of error, the misapplication of EOQ and re-order point (ROP) techniques to a given system. Class discussion can conclude with student recommendations of alternative techniques which may be better suited to the Blanchard operation than the EOQ/ROP method.

Settings

Location:
Size:
USD4 million sales
Other setting(s):
1972

Related