Subject category:
Production and Operations Management
Published by:
Ivey Publishing
Version: 2009-09-28
Length: 5 pages
Data source: Field research
Share a link:
https://casecent.re/p/58071
Write a review
|
No reviews for this item
This product has not been used yet
Abstract
A junior executive is given the task of calculating a benchmark common in the ship building industry - cost per compensated gross ton. Although raw data is available for its components, the executive must formulate relationships between the data to determine the benchmark. The case is designed to provide: (1) an introduction to the construction and use of benchmarks in quality management; and (2) practice in conceptualizing a problem and designing a basic spreadsheet model to solve the problem. The modelling procedure uses an influence diagram as the basis for constructing the spreadsheet model (7B05D011).
About
Abstract
A junior executive is given the task of calculating a benchmark common in the ship building industry - cost per compensated gross ton. Although raw data is available for its components, the executive must formulate relationships between the data to determine the benchmark. The case is designed to provide: (1) an introduction to the construction and use of benchmarks in quality management; and (2) practice in conceptualizing a problem and designing a basic spreadsheet model to solve the problem. The modelling procedure uses an influence diagram as the basis for constructing the spreadsheet model (7B05D011).