The US Navy Aircraft Intermediate Maintenance Depot (AIMD) Lemoore Power Plants Division (F404 engine maintenance) was a real mess. Not-Ready-For-Issue parts were everywhere. Division thru-put was poor, there were 30 F/A-18 aircraft with bare firewalls (no engines), the maintenance crews were working 12-hour days, manning was at 61% of authorized levels, reenlistment rates were an abysmal 50%, and crew morale was lousy. The Officer-in-Charge of the Aircraft Intermediate Maintenance Detachment decided to use Lean manufacturing to tackle the challenge. It would be the first application of the Lean concept to Naval Aviation.
Industry:

About

Abstract

The US Navy Aircraft Intermediate Maintenance Depot (AIMD) Lemoore Power Plants Division (F404 engine maintenance) was a real mess. Not-Ready-For-Issue parts were everywhere. Division thru-put was poor, there were 30 F/A-18 aircraft with bare firewalls (no engines), the maintenance crews were working 12-hour days, manning was at 61% of authorized levels, reenlistment rates were an abysmal 50%, and crew morale was lousy. The Officer-in-Charge of the Aircraft Intermediate Maintenance Detachment decided to use Lean manufacturing to tackle the challenge. It would be the first application of the Lean concept to Naval Aviation.

Settings

Industry:

Related