Case
-
Reference no. 9A88D012
Published by: Ivey Publishing
Originally published in: 1988
Version: 1993-04-08

Abstract

Problems had come to a head at the Fokker aircraft company''s parts fabrication facility. Backlogs had gone from essentially zero two years previously to a size that was threatening the economic viability of not just the company''s two new aircraft programs, but the company itself. At the centre of the problem were: (1) a manufacturing information system whose information was being questioned by all sides; (2) a production planning department that was swamped with work; and (3) a manufacturing function whose capacity to keep up with demand was in dispute. A decision and action plan is needed.
Location:
Size:
Large

About

Abstract

Problems had come to a head at the Fokker aircraft company''s parts fabrication facility. Backlogs had gone from essentially zero two years previously to a size that was threatening the economic viability of not just the company''s two new aircraft programs, but the company itself. At the centre of the problem were: (1) a manufacturing information system whose information was being questioned by all sides; (2) a production planning department that was swamped with work; and (3) a manufacturing function whose capacity to keep up with demand was in dispute. A decision and action plan is needed.