Product details

Product details
By continuing to use our site you consent to the use of cookies as described in our privacy policy unless you have disabled them.
You can change your cookie settings at any time but parts of our site will not function correctly without them.
Thumbnail image for product with reference number 9-720-383
Compact case
Published by: Harvard Business Publishing
Originally published in: 2019
Version: 17 October 2019
Length: 5 pages
Data source: Published sources

Abstract

Supplement to the A case. This case describes an issue with the batteries of Boeing's 787 Dreamliner planes overheating and sometimes catching fire in 2013. The planes were grounded for several months until Boeing introduced new safety measures. The case also discusses a problem with cracks on the wings of Airbus's A380 superjumbo, which required the company to make a costly fix to a particular wing component.
Locations:
Size:
> 1 billion; Fortune 500
Other setting(s):
2012-2013

About

Abstract

Supplement to the A case. This case describes an issue with the batteries of Boeing's 787 Dreamliner planes overheating and sometimes catching fire in 2013. The planes were grounded for several months until Boeing introduced new safety measures. The case also discusses a problem with cracks on the wings of Airbus's A380 superjumbo, which required the company to make a costly fix to a particular wing component.

Settings

Locations:
Size:
> 1 billion; Fortune 500
Other setting(s):
2012-2013

Related